Bridgwater Energy from Waste plant

Somerset

The 7.75MW Resource Recovery facility will employ up to 25 full-time operational staff and process approximately 100,000 tonnes of commercial and municipal refuse derived fuel (“RDF”) per annum, which would otherwise have been destined for landfill. Construction will commence in Q1 2019 and the facility will begin commercial operation in 2021.

working on behalf of Aardvark EM Ltd, assisted in achieving planning approval in 2015 for a new Materials Recovery Facility (MRF) and Energy Recovery Facility (ERF) in Bridgwater, Sedgemoor.  The facility will process some 80,000 tonnes of non-hazardous material per year that would otherwise have been landfilled.